ST 3 SB PLGM HWY over ST123 WEBSTER ST

.2 MI S OF NORWELL TL · County 023, Massachusetts · Built 2019 · 3 Lanes · 39,576 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
H06010BREDOTNBI
Year Built
2019
Length
31 m (101.7 ft)
Max Span
29 m
Width
18.2 m (59.7 ft)
Lanes
3
Daily Traffic
39,576
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.