ST 3 NB PLGRM HWY over ST228 HINGHAM ST
.4 M S OF HINGHAM TL · County 023, Massachusetts · Built 1960 · 3 Lanes · 72,284 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.16605, -70.892914
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 66 years old.
Nearby Bridges
ST 3 SB PLGRM HWY over ST228 HINGHAM ST
Built 1960
ST 3 NB PLGM HWY over HWY HIGH ST
Built 2019
ST 3 SB PLGM HWY over HWY HIGH ST
Built 2019
HWY DERBY ST over ST 3 PILGRIM HWY
Built 1958
ST 3 SB PLGM HWY over ST123 WEBSTER ST
Built 2019
ST 3 NB PLGM HWY over ST123 WEBSTER ST
Built 2019
ST 3 NB over HWY PLEASANT ST
Built 1957
ST 3 SB over HWY PLEASANT ST
Built 1957
ST 53 WASHNGTON ST over ST 3 PILGRIM HWY
Built 2012
HWY LIB IND PKWY over WATER SWAMP RIVER
Built 1992
Bridge Details
- Structure #
- R0800449FDOTNBI
- Year Built
- 1960
- Reconstructed
- 2007
- Length
- 49.4 m (162.1 ft)
- Max Span
- 23.2 m
- Width
- 14.8 m (48.6 ft)
- Lanes
- 3
- Daily Traffic
- 72,284
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,814,000
- Total Project Cost
- $7,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.