ST 3 SB over HWY PLEASANT ST

1.1 KM W OF HINGHAM T.L. · County 021, Massachusetts · Built 1957 · 3 Lanes · 80,948 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W32025350DOTNBI
Year Built
1957
Reconstructed
1980
Length
20.7 m (67.9 ft)
Max Span
18.3 m
Width
17.6 m (57.7 ft)
Lanes
3
Daily Traffic
80,948
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$589,000
Total Project Cost
$884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.