HWY MIDDLE ST over ST 3

2.1 KM E OF BRAIN. T.L. · County 021, Massachusetts · Built 1957 · 2 Lanes · 28,189 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W3202436GDOTNBI
Year Built
1957
Length
78.5 m (257.5 ft)
Max Span
20.3 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
28,189
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,478,000
Total Project Cost
$2,218,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.