ST 18 MAIN ST over ST 3

1.4 KM E BRAINTREE T.L. · County 021, Massachusetts · Built 1957 · 4 Lanes · 47,327 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W32023348DOTNBI
Year Built
1957
Reconstructed
1980
Length
43.9 m (144 ft)
Max Span
22.6 m
Width
27.2 m (89.2 ft)
Lanes
4
Daily Traffic
47,327
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,770,000
Total Project Cost
$11,656,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.