ST 18 MAIN ST over WATER MILL RIVER

.16 KM N OF ST 3 · County 021, Massachusetts · Built 1957 · 4 Lanes · 47,300 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
W32028349DOTNBI
Year Built
1957
Length
11 m (36.1 ft)
Max Span
5.2 m
Width
57.3 m (188 ft)
Lanes
4
Daily Traffic
47,300
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$347,000
Total Project Cost
$521,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.