HWY FRONT ST over ST 3

1.3 KM E BRAINTREE T.L. · County 021, Massachusetts · Built 1957 · 2 Lanes · 6,465 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W3202236QDOTNBI
Year Built
1957
Length
72.7 m (238.5 ft)
Max Span
26.8 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
6,465
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,365,000
Total Project Cost
$2,048,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.