ST 3 OFF RAMP NB over WATER MILL RIVER

.16 KM N OF ST 3 · County 021, Massachusetts · Built 1957 · 1 Lanes · 8,276 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
W32029352DOTNBI
Year Built
1957
Length
10.7 m (35.1 ft)
Max Span
5.2 m
Width
18.3 m (60 ft)
Lanes
1
Daily Traffic
8,276
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$334,000
Total Project Cost
$502,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.