ST 3 A/MAIN ST over WATER NORTH RIVER
AT MARSHFIELD SCITUATE TL · County 023, Massachusetts · Built 2001 · 2 Lanes · 18,557 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.161111, -70.742361
This bridge is in worse condition than 32.3% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 25 years old.
Nearby Bridges
HWY STOCKBDGE RD over RR MBTA
Built 2005
HWY UNION ST over WATER NORTH RIVER
Built 1920
HWY FRONT ST over WATER SATUIT BROOK
Built 1986
HWY ED FOSTER RD over WATER TIDAL INLET
Built 1930
HWY SEA ST over WATER SOUTH RIVER
Built 2010
HWY JULIAN ST over WATER SOUTH RIVER
Built 2010
ST 3 NB over WATER NORTH RIVER
Built 1961
ST 3 SB over WATER NORTH RIVER
Built 1961
HWY RIVER ST over ST 3
Built 1961
ST 3 NB/PLGRM HWY over ST139 CHURCH ST
Built 1961
Bridge Details
- Structure #
- M07002AMBDOTNBI
- Year Built
- 2001
- Length
- 169 m (554.5 ft)
- Max Span
- 50.6 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 2
- Daily Traffic
- 18,557
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,587,000
- Total Project Cost
- $5,381,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.