HWY STOCKBDGE RD over RR MBTA
MBTA MP 27/665 · County 023, Massachusetts · Built 2005 · 2 Lanes · 6,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
42.179783, -70.746364
This bridge is in worse condition than 10.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 21 years old.
Nearby Bridges
ST 3 A/MAIN ST over WATER NORTH RIVER
Built 2001
HWY FRONT ST over WATER SATUIT BROOK
Built 1986
HWY ED FOSTER RD over WATER TIDAL INLET
Built 1930
HWY UNION ST over WATER NORTH RIVER
Built 1920
HWY COUNTRY WAY over WATER BOUND BROOK
Built 2008
HWY MORD LINC RD over WATER BOUND BROOK
Built 1850
HWY SEA ST over WATER SOUTH RIVER
Built 2010
HWY JULIAN ST over WATER SOUTH RIVER
Built 2010
HWY RIVER ST over ST 3
Built 1961
HWY BORDER ST over WATER THE GULF
Built 1880
Bridge Details
- Structure #
- S070059PUDOT634
- Year Built
- 2005
- Length
- 41.5 m (136.2 ft)
- Max Span
- 22.6 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 6,200
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,534,000
- Total Project Cost
- $5,302,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.