HWY BEACH ST over WATER CUT RIVER

.3 MI E OF RTE 139 · County 023, Massachusetts · Built 2020 · 2 Lanes · 800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M07007BRGMUNNBI
Year Built
2020
Length
22.2 m (72.8 ft)
Max Span
8.8 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
800
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.