HWY WICKFORD RD over WATER SUDBURY RIVER

.1 MI N OF I-90 · County 017, Massachusetts · Built 1956 · 2 Lanes · 6,200 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
F0706424GMUNNBI
Year Built
1956
Reconstructed
2015
Length
48 m (157.5 ft)
Max Span
19.8 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
6,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,216,000
Total Project Cost
$4,825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.