HWY CENTRAL ST over WATER SUDBURY RIVER
.1 MI W OF CONCORD ST · County 017, Massachusetts · Built 1920 · 2 Lanes · 8,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.305942, -71.431339
This bridge is in worse condition than 9.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 106 years old.
Nearby Bridges
I 90 EB over HWY EDGELL RD
Built 1957
I 90 WB over HWY EDGELL RD
Built 1957
HWY MAIN ST over ST 9 WORCESTER RD
Built 1967
ST 9 /ST30/WRCSTR over WATER SUDBURY RIVER
Built 2009
HWY GROVE ST over I 90
Built 1957
HWY MAIN ST over WATER SUDBURY RIVER
Built 1878
ST 30 PLEASANT ST over I 90
Built 1957
HWY UNION AVE over WATER SUDBURY RIVER
Built 1985
I 90 WB over WATER SUDBURY RIVER
Built 1957
I 90 EB over WATER SUDBURY RIVER
Built 1957
Bridge Details
- Structure #
- F0700924AMUNNBI
- Year Built
- 1920
- Reconstructed
- 2016
- Length
- 64 m (210 ft)
- Max Span
- 27.4 m
- Width
- 15.3 m (50.2 ft)
- Lanes
- 2
- Daily Traffic
- 8,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,431,000
- Total Project Cost
- $3,647,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.