HWY UNION AVE over WATER SUDBURY RIVER
.4 MI S OF MAIN ST · County 017, Massachusetts · Built 1985 · 2 Lanes · 14,143 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.292733, -71.427428
This bridge is in worse condition than 9.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 41 years old.
Nearby Bridges
HWY FRANKLIN ST over WATER SUDBURY RIVER
Built 1934
HWY MAIN ST over WATER SUDBURY RIVER
Built 1878
HWY MT WAYTE AVE over RR CSX
Built 1947
ST 9 /ST30/WRCSTR over WATER SUDBURY RIVER
Built 2009
HWY MT WAYTE AVE over WATER EAMES BROOK
Built 1947
HWY MAIN ST over ST 9 WORCESTER RD
Built 1967
HWY WINTER ST over WATER SUDBURY RIVER
Built 1877
HWY WINTER ST over WATER SUDBURY RIVER
Built 1870
HWY CENTRAL ST over WATER SUDBURY RIVER
Built 1920
ST126 CONCORD ST over ST 9 WORCESTER RD
Built 1931
Bridge Details
- Structure #
- F07004246MUNNBI
- Year Built
- 1985
- Length
- 18 m (59.1 ft)
- Max Span
- 17.7 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 14,143
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $889,000
- Total Project Cost
- $1,334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.