ST 9 /ST30/WRCSTR over WATER SUDBURY RIVER
.25 MI W OF PROSPECT ST · County 017, Massachusetts · Built 2009 · 4 Lanes · 52,165 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.298806, -71.426806
This bridge is in worse condition than 9.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 17 years old.
Nearby Bridges
HWY MAIN ST over WATER SUDBURY RIVER
Built 1878
HWY MAIN ST over ST 9 WORCESTER RD
Built 1967
HWY UNION AVE over WATER SUDBURY RIVER
Built 1985
HWY FRANKLIN ST over WATER SUDBURY RIVER
Built 1934
HWY CENTRAL ST over WATER SUDBURY RIVER
Built 1920
HWY MT WAYTE AVE over RR CSX
Built 1947
HWY MT WAYTE AVE over WATER EAMES BROOK
Built 1947
I 90 EB over HWY EDGELL RD
Built 1957
I 90 WB over HWY EDGELL RD
Built 1957
HWY WINTER ST over WATER SUDBURY RIVER
Built 1877
Bridge Details
- Structure #
- F070069BHDOTNBI
- Year Built
- 2009
- Length
- 28.6 m (93.8 ft)
- Max Span
- 27.5 m
- Width
- 28.8 m (94.5 ft)
- Lanes
- 4
- Daily Traffic
- 52,165
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $46,000
- Total Project Cost
- $70,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.