ST 9 /ST30/WRCSTR over WATER SUDBURY RIVER

.25 MI W OF PROSPECT ST · County 017, Massachusetts · Built 2009 · 4 Lanes · 52,165 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F070069BHDOTNBI
Year Built
2009
Length
28.6 m (93.8 ft)
Max Span
27.5 m
Width
28.8 m (94.5 ft)
Lanes
4
Daily Traffic
52,165
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$46,000
Total Project Cost
$70,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.