I 90 EB over HWY EDGELL RD

I-90 MM 113.9 · County 017, Massachusetts · Built 1957 · 3 Lanes · 55,581 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
F070564PBDOTNBI
Year Built
1957
Reconstructed
1988
Length
37.2 m (122 ft)
Max Span
15.2 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
55,581
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,589,000
Total Project Cost
$6,884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.