I 90 WB over WATER SUDBURY RIVER

114.9 MM ON I-90 · County 017, Massachusetts · Built 1957 · 3 Lanes · 57,526 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F070464P8DOTNBI
Year Built
1957
Reconstructed
1989
Length
54.9 m (180.1 ft)
Max Span
22.3 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
57,526
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$343,000
Total Project Cost
$515,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.