I 90 WB over ST126 CONCORD ST

MM 115.8 W OF EX 117 · County 017, Massachusetts · Built 1957 · 3 Lanes · 52,861 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
F070584P6DOTNBI
Year Built
1957
Reconstructed
1989
Length
38.1 m (125 ft)
Max Span
19 m
Width
19.5 m (64 ft)
Lanes
3
Daily Traffic
52,861
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,938,000
Total Project Cost
$7,408,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.