I 90 EB over WATER SUDBURY RIVER

MM 114.9 OF I-90 · County 017, Massachusetts · Built 1957 · 3 Lanes · 62,597 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F070464P7DOTNBI
Year Built
1957
Reconstructed
1988
Length
54.9 m (180.1 ft)
Max Span
22.3 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
62,597
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,642,000
Total Project Cost
$9,964,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.