HWY CENTRAL ST over WATER SUDBURY RIVER

JUST E OF EDGELL RD · County 017, Massachusetts · Built 1969 · 2 Lanes · 17,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F07007249MUNNBI
Year Built
1969
Length
26.2 m (86 ft)
Max Span
24.4 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
17,300
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,010,000
Total Project Cost
$1,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.