I 90 WB over HWY CENTRAL ST
I-90 MM 115.0 · County 017, Massachusetts · Built 1957 · 3 Lanes · 52,861 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.314719, -71.415394
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 EB over HWY CENTRAL ST
Built 1957
I 90 EB over WATER SUDBURY RIVER
Built 1957
I 90 WB over WATER SUDBURY RIVER
Built 1957
HWY WICKFORD RD over WATER SUDBURY RIVER
Built 1956
I 90 WB over ST126 CONCORD ST
Built 1957
I 90 EB over ST126 CONCORD ST
Built 1957
HWY CENTRAL ST over WATER SUDBURY RIVER
Built 1969
HWY CENTRAL ST over WATER SUDBURY RIVER
Built 1920
HWY CONCORD ST over WATER SUDBURY RIVER
Built 1992
I 90 EB over HWY EDGELL RD
Built 1957
Bridge Details
- Structure #
- F070574PADOTNBI
- Year Built
- 1957
- Reconstructed
- 1989
- Length
- 20.5 m (67.3 ft)
- Max Span
- 18.4 m
- Width
- 19.1 m (62.7 ft)
- Lanes
- 3
- Daily Traffic
- 52,861
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,604,000
- Total Project Cost
- $3,907,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.