I 90 EB over OTHER COCHITUATE TRAIL
I-90 MM 116.4 · County 017, Massachusetts · Built 1957 · 4 Lanes · 48,475 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.313203, -71.387892
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 WB over OTHER COCHITUATE TRAIL
Built 1957
HWY OLD CONN PTH over I 90
Built 1957
I 90 EX 117 IN 13 over I 90
Built 1957
I 90 EX 117 IN 13 over OTHER COCHITUATE TRAIL
Built 1957
I 90 EX 117 IN 13 over HWY SPEEN ST
Built 1957
I 90 EX 117 IN 13 over ST 30 COCHITUATE RD
Built 1957
I 90 EB over ST126 CONCORD ST
Built 1957
I 90 WB over ST126 CONCORD ST
Built 1957
ST 30 COMM RD over I 90
Built 1957
HWY CONCORD ST over WATER SUDBURY RIVER
Built 1992
Bridge Details
- Structure #
- F070474P2DOTNBI
- Year Built
- 1957
- Reconstructed
- 1996
- Length
- 43 m (141.1 ft)
- Max Span
- 15.8 m
- Width
- 22.1 m (72.5 ft)
- Lanes
- 4
- Daily Traffic
- 48,475
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,313,000
- Total Project Cost
- $9,470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.