I 90 EB over OTHER COCHITUATE TRAIL

I-90 MM 116.4 · County 017, Massachusetts · Built 1957 · 4 Lanes · 48,475 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
F070474P2DOTNBI
Year Built
1957
Reconstructed
1996
Length
43 m (141.1 ft)
Max Span
15.8 m
Width
22.1 m (72.5 ft)
Lanes
4
Daily Traffic
48,475
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,313,000
Total Project Cost
$9,470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.