I 90 EX 117 IN 13 over HWY SPEEN ST
INT 13 TOLL PLAZA · County 017, Massachusetts · Built 1957 · 5 Lanes · 52,165 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.310944, -71.386103
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 EX 117 IN 13 over OTHER COCHITUATE TRAIL
Built 1957
I 90 EX 117 IN 13 over I 90
Built 1957
I 90 EB over OTHER COCHITUATE TRAIL
Built 1957
I 90 WB over OTHER COCHITUATE TRAIL
Built 1957
I 90 EX 117 IN 13 over ST 30 COCHITUATE RD
Built 1957
HWY OLD CONN PTH over I 90
Built 1957
ST 30 COMM RD over I 90
Built 1957
I 90 EB over ST126 CONCORD ST
Built 1957
I 90 WB over ST126 CONCORD ST
Built 1957
HWY RAMP B over ST 9 & RAMP A
Built 1977
Bridge Details
- Structure #
- F070624PPDOTNBI
- Year Built
- 1957
- Reconstructed
- 1993
- Length
- 24.6 m (80.7 ft)
- Max Span
- 21.6 m
- Width
- 29.7 m (97.4 ft)
- Lanes
- 5
- Daily Traffic
- 52,165
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,314,000
- Total Project Cost
- $3,472,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.