ST 30 COMM RD over I 90
I-90 MM 117.2 · County 017, Massachusetts · Built 1957 · 2 Lanes · 21,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.311267, -71.374294
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 EX 117 IN 13 over I 90
Built 1957
I 90 EX 117 IN 13 over OTHER COCHITUATE TRAIL
Built 1957
I 90 EX 117 IN 13 over HWY SPEEN ST
Built 1957
I 90 EB over OTHER COCHITUATE TRAIL
Built 1957
I 90 EX 117 IN 13 over ST 30 COCHITUATE RD
Built 1957
I 90 WB over OTHER COCHITUATE TRAIL
Built 1957
I 90 WB over ST 27 N MAIN ST
Built 1957
I 90 EB over ST 27 N MAIN ST
Built 1957
HWY SPEEN ST NB over ST 9 WORCESTER ST
Built 1977
HWY SPEEN ST SB over ST 9 & RAMP A
Built 1977
Bridge Details
- Structure #
- N030364PQDOTNBI
- Year Built
- 1957
- Reconstructed
- 1993
- Length
- 87.8 m (288.1 ft)
- Max Span
- 29.2 m
- Width
- 18 m (59.1 ft)
- Lanes
- 2
- Daily Traffic
- 21,700
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,284,000
- Total Project Cost
- $15,427,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.