HWY SPEEN ST NB over ST 9 WORCESTER ST
0.8 MI W OF RT-27 · County 017, Massachusetts · Built 1977 · 3 Lanes · 21,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
42.299344, -71.376697
This bridge is in worse condition than 89.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 49 years old.
Nearby Bridges
HWY SPEEN ST NB over HWY RAMPS D & G
Built 1977
HWY SPEEN ST SB over ST 9 & RAMP A
Built 1977
HWY RAMP B over ST 9 & RAMP A
Built 1977
ST 9 WORCESTER ST over WATER LAKE COCHITUATE
Built 2007
I 90 EX 117 IN 13 over ST 30 COCHITUATE RD
Built 1957
ST 30 COMM RD over I 90
Built 1957
ST 27 N MAIN ST over ST 9 WORCESTER ST
Built 1931
I 90 EX 117 IN 13 over HWY SPEEN ST
Built 1957
I 90 EX 117 IN 13 over OTHER COCHITUATE TRAIL
Built 1957
I 90 EX 117 IN 13 over I 90
Built 1957
Bridge Details
- Structure #
- N03035293DOTNBI
- Year Built
- 1977
- Length
- 30.8 m (101 ft)
- Max Span
- 14.6 m
- Width
- 15.8 m (51.8 ft)
- Lanes
- 3
- Daily Traffic
- 21,600
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,180,000
- Total Project Cost
- $4,771,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.