ST 9 WORCESTER ST over WATER LAKE COCHITUATE

0.6 MI W OF JCT RTE 9 &27 · County 017, Massachusetts · Built 2007 · 4 Lanes · 52,165 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
N030218RGDOTNBI
Year Built
2007
Length
16.3 m (53.5 ft)
Max Span
15.3 m
Width
27.5 m (90.2 ft)
Lanes
4
Daily Traffic
52,165
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$186,000
Total Project Cost
$280,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.