HWY SPEEN ST over RR MBTA/CSX

0.1 MI NORTH OF RT 135 · County 017, Massachusetts · Built 1900 · 3 Lanes · 13,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
N0301029UDOT634
Year Built
1900
Reconstructed
1954
Length
32.9 m (107.9 ft)
Max Span
18.9 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
13,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,493,000
Total Project Cost
$5,240,000