HWY COCHTUATE ST over OTHER COCHITUATE RAIL TR

0.2 MI.WST.OF ST.27 · County 017, Massachusetts · Built 1896 · 2 Lanes · 1,552 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N0300929WDOT634
Year Built
1896
Reconstructed
1994
Length
11.6 m (38.1 ft)
Max Span
10.7 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,552
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,141,000
Total Project Cost
$1,712,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.