ST 27 N MAIN ST over ST 9 WORCESTER ST
AT JCT OF RTES 9 & 27 · County 017, Massachusetts · Built 1931 · 3 Lanes · 8,538 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.299989, -71.359931
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 95 years old.
Nearby Bridges
ST 9 WORCESTER ST over WATER LAKE COCHITUATE
Built 2007
HWY SPEEN ST NB over ST 9 WORCESTER ST
Built 1977
HWY SPEEN ST NB over HWY RAMPS D & G
Built 1977
HWY SPEEN ST SB over ST 9 & RAMP A
Built 1977
I 90 EB over ST 27 N MAIN ST
Built 1957
HWY RAMP B over ST 9 & RAMP A
Built 1977
I 90 WB over ST 27 N MAIN ST
Built 1957
ST 30 COMM RD over I 90
Built 1957
HWY COCHTUATE ST over OTHER COCHITUATE RAIL TR
Built 1896
HWY WASHNGTON AV over RR MBTA/CSX
Built 1895
Bridge Details
- Structure #
- N0302028QDOTNBI
- Year Built
- 1931
- Length
- 30 m (98.4 ft)
- Max Span
- 13.7 m
- Width
- 16.1 m (52.8 ft)
- Lanes
- 3
- Daily Traffic
- 8,538
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,241,000
- Total Project Cost
- $4,862,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.