I 90 WB over ST 27 N MAIN ST

I-90 MM 117.9 · County 017, Massachusetts · Built 1957 · 3 Lanes · 84,899 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N030374PVDOTNBI
Year Built
1957
Reconstructed
1989
Length
44.5 m (146 ft)
Max Span
20 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
84,899
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,785,000
Total Project Cost
$8,678,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.