HWY MAIN ST over ST 9 WORCESTER RD
.4 MI S OF I-90 · County 017, Massachusetts · Built 1967 · 5 Lanes · 38,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.300156, -71.434436
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 59 years old.
Nearby Bridges
ST 9 /ST30/WRCSTR over WATER SUDBURY RIVER
Built 2009
HWY MAIN ST over WATER SUDBURY RIVER
Built 1878
HWY CENTRAL ST over WATER SUDBURY RIVER
Built 1920
HWY GROVE ST over I 90
Built 1957
HWY UNION AVE over WATER SUDBURY RIVER
Built 1985
HWY FRANKLIN ST over WATER SUDBURY RIVER
Built 1934
I 90 EB over HWY EDGELL RD
Built 1957
I 90 WB over HWY EDGELL RD
Built 1957
HWY WINTER ST over WATER SUDBURY RIVER
Built 1877
HWY WINTER ST over WATER SUDBURY RIVER
Built 1870
Bridge Details
- Structure #
- F07040275DOTNBI
- Year Built
- 1967
- Length
- 36 m (118.1 ft)
- Max Span
- 15.5 m
- Width
- 30.1 m (98.8 ft)
- Lanes
- 5
- Daily Traffic
- 38,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,231,000
- Total Project Cost
- $10,847,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.