HWY MAIN ST over ST 9 WORCESTER RD

.4 MI S OF I-90 · County 017, Massachusetts · Built 1967 · 5 Lanes · 38,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F07040275DOTNBI
Year Built
1967
Length
36 m (118.1 ft)
Max Span
15.5 m
Width
30.1 m (98.8 ft)
Lanes
5
Daily Traffic
38,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,231,000
Total Project Cost
$10,847,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.