HWY SUMMER ST over WATER FORT POINT CHANNEL

OVER FT POINT CHANNEL · County 025, Massachusetts · Built 1899 · 4 Lanes · 28,319 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
B16031389MUNNBI
Year Built
1899
Reconstructed
1998
Length
153 m (502 ft)
Max Span
27.3 m
Width
30.5 m (100.1 ft)
Lanes
4
Daily Traffic
28,319
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$30,493,000
Total Project Cost
$45,740,000