HWY SUMMER ST over WATER FORT POINT CHANNEL
OVER FT POINT CHANNEL · County 025, Massachusetts · Built 1899 · 4 Lanes · 28,319 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
42.351319, -71.052764
This bridge is in worse condition than 55.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 127 years old.
Nearby Bridges
HWY CONGRESS ST over WATER FORT POINT CHANNEL
Built 1850
HWY SUMMER ST over HWY A ST
Built 1918
HWY SEAPORT BLVD over WATER FORT POINT CHANNEL
Built 1996
HWY SO STA IB RP over RR MBTA
Built 1995
HWY SO STA OB RP over OTHER RELIEF
Built 1995
HWY SO STA BUSWY over COMB MBTA & RELIEF
Built 1995
HWY SO STA CONN over COMB MBTA & RELIEF
Built 1995
HWY SO STA CONN over HWY FRONTAGE RD
Built 1995
HWY SUMMER ST over HWY W SERVICE RD EXT
Built 2003
I 93 RAMP E-SS over I 93 RAMP C
Built 2002
Bridge Details
- Structure #
- B16031389MUNNBI
- Year Built
- 1899
- Reconstructed
- 1998
- Length
- 153 m (502 ft)
- Max Span
- 27.3 m
- Width
- 30.5 m (100.1 ft)
- Lanes
- 4
- Daily Traffic
- 28,319
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $30,493,000
- Total Project Cost
- $45,740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.