HWY SUMMER ST over HWY A ST

.16 KM SE FT PT CHANNEL · County 025, Massachusetts · Built 1918 · 6 Lanes · 17,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B1612438HMUNNBI
Year Built
1918
Reconstructed
1993
Length
18 m (59.1 ft)
Max Span
16.2 m
Width
30.5 m (100.1 ft)
Lanes
6
Daily Traffic
17,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,155,000
Total Project Cost
$1,733,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.