HWY SUMMER ST over HWY C ST

0.16 KM SW OF TWT · County 025, Massachusetts · Built 2000 · 5 Lanes · 20,043 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B1658290YDOTNBI
Year Built
2000
Length
33.9 m (111.2 ft)
Max Span
31.3 m
Width
29.2 m (95.8 ft)
Lanes
5
Daily Traffic
20,043
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,076,000
Total Project Cost
$1,615,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.