HWY SUMMER ST over HWY W SERVICE RD EXT
AT CONVENTION CENTER · County 025, Massachusetts · Built 2003 · 4 Lanes · 17,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.349092, -71.047581
This bridge is in worse condition than 1.6% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 23 years old.
Nearby Bridges
HWY SUMMER ST over HWY A ST
Built 1918
HWY SUMMER ST over COMB I90 RPS& HAUL &CSX
Built 2002
HWY SUMMER ST over HWY C ST
Built 2000
HWY VIADUCT ST over COMB CNGRSS&HAUL RD&CSX
Built 2002
HWY SUMMER ST over WATER FORT POINT CHANNEL
Built 1899
HWY VIADUCT ST over HWY NORTHERN AVE
Built 1915
HWY CONGRESS ST over WATER FORT POINT CHANNEL
Built 1850
HWY D ST over COMB HAUL RD & CSX
Built 2005
HWY SEAPORT BLVD over WATER FORT POINT CHANNEL
Built 1996
HWY SO STA IB RP over RR MBTA
Built 1995
Bridge Details
- Structure #
- B165835VUDOTNBI
- Year Built
- 2003
- Length
- 69.5 m (228 ft)
- Max Span
- 39 m
- Width
- 30.5 m (100.1 ft)
- Lanes
- 4
- Daily Traffic
- 17,300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $219,000
- Total Project Cost
- $329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.