HWY SEAPORT BLVD over WATER FORT POINT CHANNEL
0.1MI EAST ATLANTIC AVE. · County 025, Massachusetts · Built 1996 · 6 Lanes · 22,000 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.353944, -71.050042
This bridge is in worse condition than 55.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 30 years old.
Nearby Bridges
HWY CONGRESS ST over WATER FORT POINT CHANNEL
Built 1850
HWY SUMMER ST over WATER FORT POINT CHANNEL
Built 1899
HWY SUMMER ST over HWY A ST
Built 1918
HWY SUMMER ST over HWY W SERVICE RD EXT
Built 2003
HWY SUMMER ST over COMB I90 RPS& HAUL &CSX
Built 2002
HWY SO STA IB RP over RR MBTA
Built 1995
HWY SO STA OB RP over OTHER RELIEF
Built 1995
HWY SO STA BUSWY over COMB MBTA & RELIEF
Built 1995
HWY SO STA CONN over COMB MBTA & RELIEF
Built 1995
HWY VIADUCT ST over HWY NORTHERN AVE
Built 1915
Bridge Details
- Structure #
- B16223AWQMUNNBI
- Year Built
- 1996
- Length
- 263.9 m (865.8 ft)
- Max Span
- 71.9 m
- Width
- 30.1 m (98.8 ft)
- Lanes
- 6
- Daily Traffic
- 22,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $51,589,000
- Total Project Cost
- $77,384,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.