HWY SEAPORT BLVD over WATER FORT POINT CHANNEL

0.1MI EAST ATLANTIC AVE. · County 025, Massachusetts · Built 1996 · 6 Lanes · 22,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B16223AWQMUNNBI
Year Built
1996
Length
263.9 m (865.8 ft)
Max Span
71.9 m
Width
30.1 m (98.8 ft)
Lanes
6
Daily Traffic
22,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$51,589,000
Total Project Cost
$77,384,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.