HWY SUMMER ST over WATER RESERVE CHANNEL

1. 6 KM SE OF FT PT CHAN · County 025, Massachusetts · Built 1892 · 4 Lanes · 24,052 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
B1603438BMUNNBI
Year Built
1892
Reconstructed
2003
Length
284.1 m (932.1 ft)
Max Span
16.7 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
24,052
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$39,965,000
Total Project Cost
$59,948,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.