HWY SUMMER ST over WATER RESERVE CHANNEL
1. 6 KM SE OF FT PT CHAN · County 025, Massachusetts · Built 1892 · 4 Lanes · 24,052 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
42.34365, -71.038089
This bridge is in worse condition than 55.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 134 years old.
Nearby Bridges
HWY FREIGHT COR over WATER RESERVE CHANNEL
Built 2017
HWY D ST over COMB HAUL RD & CSX
Built 2005
HWY SUMMER ST over HWY C ST
Built 2000
HWY VIADUCT ST over COMB CNGRSS&HAUL RD&CSX
Built 2002
HWY VIADUCT ST over HWY NORTHERN AVE
Built 1915
HWY SUMMER ST over COMB I90 RPS& HAUL &CSX
Built 2002
HWY SUMMER ST over HWY W SERVICE RD EXT
Built 2003
HWY SUMMER ST over HWY A ST
Built 1918
HWY W SECOND ST over COMB HAUL RD & MBTA RED
Built 1918
HWY W THIRD ST over COMB HAUL RD & CSX
Built 1918
Bridge Details
- Structure #
- B1603438BMUNNBI
- Year Built
- 1892
- Reconstructed
- 2003
- Length
- 284.1 m (932.1 ft)
- Max Span
- 16.7 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 24,052
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $39,965,000
- Total Project Cost
- $59,948,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.