NORTHSIDE DRIVE over I-75 (NBL)

IN N ATLANTA · County 121, Georgia · Built 1986 · 6 Lanes · 212,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012106050
Year Built
1986
Length
40.2 m (131.9 ft)
Max Span
40.2 m
Width
31.8 m (104.3 ft)
Lanes
6
Daily Traffic
212,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,078,000
Total Project Cost
$1,618,000