I-75 over M-9205 COLLIER ROAD

IN N ATLANTA · County 121, Georgia · Built 1956 · 10 Lanes · 209,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012101490
Year Built
1956
Reconstructed
1985
Length
42.1 m (138.1 ft)
Max Span
15.2 m
Width
53.9 m (176.8 ft)
Lanes
10
Daily Traffic
209,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,716,000
Total Project Cost
$2,573,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.