NORTHSIDE DRIVE over PEACHTREE CREEK

IN NORTH ATLANTA · County 121, Georgia · Built 2020 · 2 Lanes · 14,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012154000
Year Built
2020
Length
67.1 m (220.1 ft)
Max Span
33.5 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
14,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,536,000
Total Project Cost
$29,304,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.