COLLIER ROAD over TANYARD CREEK
IN N ATLANTA · County 121, Georgia · Built 1911 · 2 Lanes · 8,530 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
33.810106, -84.402289
This bridge is in worse condition than 89.8% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 115 years old.
Nearby Bridges
COLLIER ROAD over CSX RAILROAD (639818R)
Built 1928
I-75 over CSX RAILROAD
Built 1985
NORTHSIDE DRIVE over I-75 (NBL)
Built 1986
I-75 over TANYARD BRANCH
Built 1984
PEACHTREE STREET over CSX RAILROAD
Built 1914
NORTHSIDE DRIVE over I-75 (SBL) + I-75 RAMP
Built 1986
HOWELL MILL ROAD over I-75 + I-75 RAMP
Built 1986
NORTHSIDE DRIVE over PEACHTREE CREEK
Built 2020
NORTHSIDE DR (NBL) over M-9150 THIRD STREET
Built 1974
US 19 PEACHTREE ST over PEACHTREE CREEK
Built 1931
Bridge Details
- Structure #
- 000000012104360
- Year Built
- 1911
- Reconstructed
- 1950
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 8,530
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $352,000
- Total Project Cost
- $527,000