NORTHSIDE DRIVE over I-75 (SBL) + I-75 RAMP

IN NORTH ATLANTA · County 121, Georgia · Built 1986 · 7 Lanes · 24,100 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012100120
Year Built
1986
Length
56.4 m (185 ft)
Max Span
28.7 m
Width
31.8 m (104.3 ft)
Lanes
7
Daily Traffic
24,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,709,000
Total Project Cost
$2,563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.