COLLIER ROAD over CSX RAILROAD (639818R)

IN N ATLANTA · County 121, Georgia · Built 1928 · 2 Lanes · 8,530 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012104370
Year Built
1928
Reconstructed
1960
Length
27.7 m (90.9 ft)
Max Span
11.9 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
8,530
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$356,000
Total Project Cost
$533,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.