I-75 over CSX RAILROAD
IN N ATLANTA · County 121, Georgia · Built 1985 · 10 Lanes · 212,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.801989, -84.404206
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 41 years old.
Nearby Bridges
I-75 over TANYARD BRANCH
Built 1984
NORTHSIDE DRIVE over I-75 (SBL) + I-75 RAMP
Built 1986
NORTHSIDE DRIVE over I-75 (NBL)
Built 1986
NORTHSIDE DR (NBL) over M-9150 THIRD STREET
Built 1974
COLLIER ROAD over CSX RAILROAD (639818R)
Built 1928
HOWELL MILL ROAD over I-75 + I-75 RAMP
Built 1986
COLLIER ROAD over TANYARD CREEK
Built 1911
DEERING ROAD over I-75 + I-85 RAMP
Built 1984
I-85 over I-75 NBL- RAMP TO I85 NB
Built 1985
PEACHTREE STREET U over I-85- SR 13 + RAILROAD
Built 1985
Bridge Details
- Structure #
- 000000012101480
- Year Built
- 1985
- Length
- 57.6 m (189 ft)
- Max Span
- 16.8 m
- Width
- 60.7 m (199.1 ft)
- Lanes
- 10
- Daily Traffic
- 212,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,350,000
- Total Project Cost
- $3,524,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.