NORTHSIDE DR (NBL) over M-9150 THIRD STREET

IN N ATLANTA · County 121, Georgia · Built 1974 · 2 Lanes · 37,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012100110
Year Built
1974
Length
67.7 m (222.1 ft)
Max Span
22.3 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
37,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$867,000
Total Project Cost
$1,301,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.