I-85 over I-75 NBL- RAMP TO I85 NB

IN N ATLANTA · County 121, Georgia · Built 1985 · 11 Lanes · 201,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012106080
Year Built
1985
Length
51.5 m (169 ft)
Max Span
29.9 m
Width
66 m (216.5 ft)
Lanes
11
Daily Traffic
201,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,281,000
Total Project Cost
$3,422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.