17TH. STREET over I-75 & I-85 & RAMPS
IN ATLANTA · County 121, Georgia · Built 2005 · 6 Lanes · 26,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.791592, -84.391664
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 21 years old.
Nearby Bridges
I-85 RMP TO 17 ST over SR 401 SOUTH RAMP TO 14T
Built 2005
RAMP I-75 TO 17TH over WILLIAMS & 16TH ST
Built 2010
SR 13 over CS 551 EQUIFAX DRIVE
Built 1985
I-85 NBL over I-75 N&S H.O.V.
Built 1984
14TH STREET over I-75
Built 2009
I-85 over I-75 NBL- RAMP TO I85 NB
Built 1985
DEERING ROAD over I-75 + I-85 RAMP
Built 1984
SR 13 (NBL) over SR 9 (SBL) SPRING STREET
Built 1985
SR13 R TO PTREE S over SR 13
Built 1984
PEACHTREE STREET U over I-85- SR 13 + RAILROAD
Built 1985
Bridge Details
- Structure #
- 000000012153050
- Year Built
- 2005
- Length
- 292.6 m (960 ft)
- Max Span
- 103 m
- Width
- 41.8 m (137.1 ft)
- Lanes
- 6
- Daily Traffic
- 26,200
- Material
- Steel
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,209,000
- Total Project Cost
- $9,313,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.