14TH STREET over I-75

IN ATLANTA · County 121, Georgia · Built 2009 · 6 Lanes · 15,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012153370
Year Built
2009
Length
120.7 m (396 ft)
Max Span
50.9 m
Width
35.1 m (115.2 ft)
Lanes
6
Daily Traffic
15,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,235,000
Total Project Cost
$4,853,000