RAMP I-75 TO 17TH over WILLIAMS & 16TH ST

IN ATLANTA · County 121, Georgia · Built 2010 · 2 Lanes · 16,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012153380
Year Built
2010
Length
253 m (830.1 ft)
Max Span
37.5 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
16,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,243,000
Total Project Cost
$4,864,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.