HOWELL MILL ROAD over I-75 + I-75 RAMP

IN N ATLANTA · County 121, Georgia · Built 1986 · 6 Lanes · 17,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012104020
Year Built
1986
Length
68.6 m (225.1 ft)
Max Span
29.3 m
Width
27.5 m (90.2 ft)
Lanes
6
Daily Traffic
17,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,838,000
Total Project Cost
$2,757,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.